ANBİMEX

ANBİMEX

Active Ingredient: 85 g/L Pyraclostrobin + 62.5 g/L Epoxiconazole

Formulation: Suspo-Emulsion (SE)

Packing: 100 ml, 200 ml, 250 ml, 400 ml, 500 ml, 1L, 5L, 10L 

 

Use plant protection products with care.

Be sure to read the label and product information before use.

Label Information Safety Data Sheet Product Brochure

PLANT AND DAMAGED ORGANIZATIONS WHERE THE END PROTECTION PRODUCT WILL BE USED

 

Plant name

 

Name of harmful organism

 

Application dose

 

Time between final application and harvest

 

 

 

wheat

Grain ash

(Erysiphe graminis fsp tritici)

 

200 ml /da

 

42 days

 

Septor leaf stain

(Septoria tritici)

 

200 ml /da

 

42 days

Brown rust

(Puccinia recondita tritici)

 

200 ml /da

 

42 days

barley

Barley leaf rust (Puccinia hordei)

150 ml /da

42 days

Sugar beet

Leaf stain disease

(Cercospora beticola)

150 ml /da

-

Egypt

North and south leaf blight in Egypt (Setosphaeria turcica, Cochliobolus heterostrophus)

200 ml /da

14 days

HOW TO USE THE PLANT PROTECTION PRODUCT

Grain powdery mildew in wheat: The application should be started when the first pustules of the disease are seen. If deemed necessary, a second application should be made.

Septoria leaf spot in wheat: If the climatic conditions are suitable for the development of the disease and there is an epidemic situation, green parts are applied. The application is started when the symptoms of the disease are first seen. In general, the best time to apply is at the end of the scabbard period when the flag leaf is fully opened or before the spike emergence. For an infection that climbs towards the upper parts of the plant in the early period, the emergence of the flag leaf should not be expected. Likewise, if the field is contaminated and rainy weather continues during the earing period, it may be necessary to apply because of economic damage. A second application can be made after 21-28 days.

Wheat and Barley Rust diseases: The application should be started when disease symptoms (pustules) are seen. Green parts are applied against rust factors. The application should be done so that the surface of the leaves and stem is covered with the mixture. If the conditions are suitable for the development of the disease, a second application can be made, taking into account the duration of action of the product. One month before harvesting, the application should not be done as the plant is in the maturation period.

Sugar beet Leaf spot disease: Spraying should be started as soon as the symptoms appear and should be continued at 14-day intervals depending on the course of the disease.

Northern and Southern Leaf Blight Disease in Corn: First applications are made when the conditions are suitable for the disease in the region and symptoms of the disease are seen. If the conditions are suitable for the development of the disease, the second application should be made with an interval of 14 days. A good coating should be made.

MIXABILITY STATUS

A pre-mix test must be done before mixing with other products.

Sitemizden en iyi şekilde faydalanabilmeniz için çerezler kullanılmaktadır. Bu siteye giriş yaparak çerez kullanımını kabul etmiş sayılıyorsunuz. Daha Fazla Bilgi